Pollution Engineering Magazine
  Resources
  Archives
  Digital Edition Archives
  Buyers Guide
  Classified Ads
  White Papers
  Industry Links
  Market Research
  Career Center
  Resource Guide
  Current Issue
  Cover Story
  Features
  Columns
  Industry News
  PE Info
  Contact Us
  Media Kit
  About
  Online
  PE Coffeehaus
  PE Partner Blogs
  eNewsletters
  Calendar
  ePE-TV
  Webinars
  Podcast
  PE Learning Center
Search in: EditorialProductsCompanies
Cape Cod Wind Farm Approved
by Roy Bigham
April 28, 2010

ARTICLE TOOLS
EmailEmailPrintPrintReprintsReprintsshareShare



The Cape Wind project is expected to include 130 floating turbines to supply over 200,000 homes with their electrical needs. The closest turbine to land will be 5.2 miles offshore.
Secretary of the Interior Ken Salazar announced on April 28, 2010 that his department approved the Cape Wind renewable energy project on federal submerged lands in Nantucket Sound, but will require the developer of the $1 billion wind farm to agree to additional binding measures to minimize the potential adverse impacts of construction and operation of the facility.

"After careful consideration of all the concerns expressed during the lengthy review and consultation process and thorough analyses of the many factors involved, I find that the public benefits weigh in favor of approving the Cape Wind project at the Horseshoe Shoal location," Salazar said in an announcement at the State House in Boston. "With this decision we are beginning a new direction in our Nation's energy future, ushering in America's first offshore wind energy facility and opening a new chapter in the history of this region."

The project is expected to erect 130 wind turbines with the closest one to land off the Cape to be 5.2 miles. While environmentalists have enthusiastically approved of this project for nearly a decade, political forces from residents living on the island have used every legal measure available to block the project including writing new laws that would eliminate the ability to build. Other offshore projects have been suggested along the coast and in the Gulf of Mexico. Because of delays with this project, the other projects have been in a limbo status. Opponents have vowed to take the next step and file lawsuits to further block construction. However, this announcement may be enough to loosen approvals for the other projects that are in waiting.

Click here to read the entire announcement from Mr. Salazar.


Roy Bigham
roy@pollutionengineering.com
Roy D. Bigham has been the editor of Pollution Engineering since 2002. Bigham attended Eastern Michigan University where he majored in chemistry and computer science with an associates degree in mathematics. He has worked as a laboratory technician at a research laboratory, managed an electroplating operation and an associated analytical laboratory. He spent three years overseeing environmental operations of five domestic and five overseas operations for a major manufacturer in the Detroit area. He then managed a field services department for an environmental analytical laboratory before moving on to a position as an environmental engineer for a construction aggregates company.

Bigham won a design award for a waste water treatment system for a landfill in the Detroit area from the State Chamber of Commerce. He has been active in the environmental field since 1980.


|PrintEmail

Did you enjoy this article? Click here to subscribe to the magazine.











BNP Media
© 2010 BNP Media. All rights reserved. | Privacy Policy